Tuesday, May 10, 2016

Photo Shoot

Above: Transmission line pole set between Cohocton Wind Farm’s two substations.

The images in this post are outtakes from two photo shoots where I was hired to capture aspects of the construction process at Cohocton Wind Farm.

Select “Read More”, below, or click on this title to view the entire post.

(As always, click on any image in the post for an enlarged view.)
Above: Linemen setting up for next phase line work.

 
Above: Welding prefabrication of substation components.

Above: Substation construction.

Above: Substation testing.

Above: Boring holes for transmission line poles.

Above: Lineman making a big stretch.

Above: Positioning a transmission pole for hoisting and setting.

Above: Setting a 185,000 pound substation transformer.

Above: Linemen at work. 

Above: Filling and tamping around a newly set transmission pole.

Above: Transporting a 185,000 pound substation transformer up a steep gravel site road.