Less than two hours before Nik Wallenda’s historic walk across Niagara
Falls I captured this image of his 1800-foot custom manufactured wire
rope pulled to an event-ready tension of 65,000 pounds.
This photograph took first prize at the Power Delivery Design Conference’s annual photo contest, an invite-only technical conference held in Sun Valley, Idaho. The platform this year focused on power delivery education in disciplines that included overhead and underground transmission lines, substations, and electrical system engineering.
No comments:
Post a Comment